What we are building

HGX B200 and B300 nodes in a Santiago data centre, live from December 2026. A first hall of 864 Blackwell Ultra GPUs in an existing Santiago data centre, live Q1 2027, built against one signed contract and looking for its offtaker. Then a permitted 20 MW campus.

Ready first

Blackwell nodes, live from December 2026

NVIDIA HGX B200 and HGX B300, eight GPUs per node, air cooled, in a Santiago data centre. From one node up, joined by InfiniBand into one cluster when you take more than one. Reserve now for a December 2026 start, while the GB300 hall follows in Q1 2027.

NVIDIA HGX B300

8 Blackwell Ultra GPUs, 2.3 TB HBM3e per node, ConnectX-8 at 800 Gb/s per GPU. Training and inference.

NVIDIA HGX B200

8 Blackwell GPUs, 1.4 TB HBM3e per node, ConnectX-7 at 400 Gb/s per GPU. Training and inference.

Live from
December 2026
Smallest block
One node, 8 GPUs
Cooling
Air cooled
GPU fabric
InfiniBand, sized to the cluster
Software
Slurm and managed Kubernetes
Location
A data centre in the Santiago Metropolitan Region

The first hall

864 GPUs, one training cluster

Twelve NVIDIA GB300 NVL72 racks in an existing data centre in the Santiago Metropolitan Region, joined by an InfiniBand Quantum-X800 fabric. One rack is the smallest block and twelve is the whole hall.

864 GPUs

12 racks. Pick a rack to size a smaller block.

Reserve 12 racks
GPUs
864 Blackwell Ultra
Platform
12 × NVIDIA GB300 NVL72
GPU fabric
InfiniBand, Quantum-X800, rail optimised
Built for
Training
Rack power
132 to 140 kW rated, 155 kW peak
Cooling
Liquid cooled racks
Software
Slurm and managed Kubernetes
Storage
Parallel file system, sized to the workload
Smallest block
One rack, 72 GPUs
Location
An existing data centre in the Santiago Metropolitan Region
Electrical supply
380 to 400 V at 50 Hz, specified from the first drawing
First rack live
Q1 2027

What comes next

The campus: 20 MW

A permitted greenfield site in the Santiago Metropolitan Region, planned as four 5 MW halls. Every permit the 20 MW campus needs is held, including the building permit. The builder and the site are named under a mutual NDA.

20 MW IT
25 to 27 MW at the meter
8,640 GPUs
120 racks in four halls
18 months
To all four halls energized, per the contractor

Built to Chile

The supply

380 to 400 V at 50 Hz. NVIDIA reference designs assume 415 or 480 V at 60 Hz, so the power shelves are specified to the Chilean supply from the first drawing.

The ground

Slabs anchored for seismic load, to the standard in force.

The water

Dry heat rejection. No water is consumed in cooling.

The next platform

800 VDC pathway, floor loading above 4,000 lb per rack and flow headroom, so the hall is not obsolete when Vera Rubin lands.

Tell us what you need